
Orleans Storm Proofing - Pumping Station 5
This project entailed providing storm and flood protection measures for Pumping Station 5 and for the installation at the new 600 CFS pumping station adjacent to it.
IMC provided full MEP design services.
This project entailed providing storm and flood protection measures for Pumping Station 5 and for the installation at the new 600 CFS pumping station adjacent to it.
IMC provided full MEP design services.